![]() ![]() Prior to the meeting, notices from the Zoning Board of Appeals will be sent first-class mail to all property owners within a radius of 300 feet of the property requesting the variance approval. At this meeting, you must appear in person or be represented by an agent or attorney. Examples include:Ĭomplete applications, $250.00 fee and a legal survey must be submitted to the Building Department by end of day on the third Monday each month to be on the ZBA agenda for the following month. Permits are required for the following work: The provisions of the Code require any owner or authorized agent intending to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by the code, or to cause any such work to be done, shall first make application to the building official and obtain the required permit. When a contractor obtains a permit, the person who holds the license must sign the application. Homeowners are eligible to obtain permits by filing an affidavit affirming they are doing the work themselves. Trade permits fees are based on the actual work being performed. If submitted digitally, we must be able to print off Ledger Size for legibility.īuilding permits fees, which include processing, staff review and all required inspections, are based on the cost of the project as determined by square footage. Please note, Full Size Plans are required. Permits can be submitted in person, by mail, faxed, dropped off in drop box or by email. Plumbing Permit Application Zoning Permit Application Sign Permit Application Township News Letters & Department Reportsīuilding Permit Application Electrical Permit Application Mechanical Permit Application. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |